V5 · Prepodadora reforzada compacta de discos
Maintenance
MM-1 · 8 hours
6 tasksMM-2 · 40 hours
9 tasks- ACT-2 · Lubrication of the bearings and shafts of the cutting module.
- ACT-9 · Thorough cleaning, drying and general oiling.
- ACT-16 · Cleaning of the filter of the disinfectant system.
- ACT-19 · Review of clearances of the disc shafts.
- ACT-26 · Retightening of screws on module bearings.
- ACT-84 · General condition of the machine.
- ACT-88 · Verify the absence of cracks in welding and screws in the tie.
- ACT-94 · Retightening of screws, nuts and fittings.
- ACT-95 · Light cleaning (excess grease, dust or mud).
MM-9 · 80 hours
4 tasksMM-3 · 200 hours
5 tasksMM-4 · 400 hours
1 taskMM-5 · 800 hours
3 tasksMM-7 · 800 hours
11 tasks- ACT-40 · Check the status of sensors and their wiring.
- ACT-47 · Replacement of filters in the disinfectant circuit.
- ACT-50 · Replacement of pinion and keyway in hydraulic motors.
- ACT-54 · Review of engine performance.
- ACT-55 · Review of pump performance.
- ACT-56 · Checking for oil leaks in hydraulic cylinders.
- ACT-57 · Review and regulation of the tare weight of the pressure limite
- ACT-81 · Replacement of suction filter.
- ACT-82 · Replacement of high pressure filter.
- ACT-83 · Replacement of the return filter.
- ACT-109 · Replacement of the Nylon/Bronze mast plates and telescopic guid
MM-12 · 1,200 hours
1 taskMM-6 · 2,400 hours
5 tasksMM-8 · 2,400 hours
3 tasksMM-11 · 4,800 hours
1 task