Maintenance actions

View the maintenance tasks associated with maintenance for ID DAVID machines.

Available maintenance tasks

TaskResponsible partyEstimated time
ACT-1 · General greasing.
ACT-2 · Lubrication of the bearings and shafts of the cutting module.
ACT-3 · Grease drive and drag chains.
ACT-4 · Grease hydraulic extension.
ACT-5 · Grease roller bearings.
ACT-6 · Grease metal wheel bearings.
ACT-7 · Grease intervines.
ACT-8 · Grease probe.
ACT-9 · Thorough cleaning, drying and general oiling.
ACT-10 · Grease the cranks of the cutter bars.
ACT-11 · Grease auger chains.
ACT-12 · Grease the hitch joint.
ACT-13 · Grease ERI joints.
ACT-14 · Cleaning of nozzles.
ACT-15 · Cleaning of the herbicide system filter.
ACT-16 · Cleaning of the filter of the disinfectant system.
ACT-17 · Clean the fan and radiator of the cooler.
ACT-18 · Emergency button operation review.
ACT-19 · Review of clearances of the disc shafts.
ACT-20 · Review of the alignment of the ERI set.
ACT-21 · Review and adjustment of clearances in ERI.To be performed at an authorised workshop
ACT-22 · Check status of connections in ERI.
ACT-23 · Check the condition of the cutting discs.
ACT-24 · Sharpening of teeth of cutting discs.To be performed at an authorised workshop
ACT-25 · Check the condition of knives and counter-knives.
ACT-26 · Retightening of screws on module bearings.
ACT-27 · Review and adjustment of disc stackups.
ACT-28 · Check of disc bearing clearances.
ACT-29 · Check the tank's oil level.
ACT-30 · Check oil level of the multiplier group.
ACT-31 · Check the condition of bearings of the drive shafts.
ACT-32 · Review and adjustment of the separation between right and left
ACT-33 · Tire pressure check.
ACT-34 · Review of the electrical connection.
ACT-35 · Adjustment of the Nylon/Bronze Plates of the slides.
ACT-36 · Revision of synchronization of chassis extension cylinders.
ACT-37 · Check the condition of the cups, shaft and arm springs.
ACT-38 · Status check of stylus rod and probe shaft.
ACT-39 · Review of inter-vine bearing clearances.
ACT-40 · Check the status of sensors and their wiring.
ACT-41 · Revision of ball joint wear cylinder and retractable pin.
ACT-42 · Checking for oil leaks in hydraulic motors.
ACT-43 · Replacement of spring traction and probe tensioning screws.
ACT-44 · Oil change in multiplier group.
ACT-45 · Check screws and absence of cracks in the coupling piece.
ACT-46 · Replacement of herbicide system filters.To be performed at an authorised workshop
ACT-47 · Replacement of filters in the disinfectant circuit.To be performed at an authorised workshop
ACT-48 · Replacement of probe knurled prisoners (drag shaft).To be performed at an authorised workshop
ACT-49 · Replacement compression spring and probe ball.To be performed at an authorised workshop
ACT-50 · Replacement of pinion and keyway in hydraulic motors.
ACT-51 · Replacement of the Nylon/Bronze plates of the slides.To be performed at an authorised workshop
ACT-52 · Replacement of inter-strain cylinder ball joints.To be performed at an authorised workshop
ACT-53 · Replacement of ERI springs.To be performed at an authorised workshop
ACT-54 · Review of engine performance.To be performed at an authorised workshop
ACT-55 · Review of pump performance.To be performed at an authorised workshop
ACT-56 · Checking for oil leaks in hydraulic cylinders.To be performed at an authorised workshop
ACT-57 · Review and regulation of the tare weight of the pressure limiteTo be performed at an authorised workshop
ACT-58 · Workshop set-up 800 hours.
ACT-59 · Replacement of inter-strain valve wear kit.To be performed at an authorised workshop
ACT-60 · Replacement of inductive sensor wiring of the probe.To be performed at an authorised workshop
ACT-61 · Retractable bolt replacement.To be performed at an authorised workshop
ACT-62 · Replacement of the probe drag axis.To be performed at an authorised workshop
ACT-63 · Hydraulic oil change tank (10w30, hv68).
ACT-64 · Replacement of the gas shock absorber of the cutter bar.To be performed at an authorised workshop
ACT-65 · Replacement of the arm springs.To be performed at an authorised workshop
ACT-66 · Pump replacement.To be performed at an authorised workshop
ACT-67 · Replacement of knives and counter-knives.To be performed at an authorised workshop
ACT-68 · Workshop set-up 2400 hours.To be performed at an authorised workshop
ACT-69 · Checking for finger wear.
ACT-70 · ID-ROLL head side change.
ACT-71 · Check the condition of the rotor blades.
ACT-72 · Replacement of the rotor blades.To be performed at an authorised workshop
ACT-73 · Check the condition of the rotor sprockets.To be performed at an authorised workshop
ACT-74 · Check the condition of the roller blades.To be performed at an authorised workshop
ACT-75 · Check the condition and tension of the chain.
ACT-76 · Review of the correct functioning of the braking system.To be performed at an authorised workshop
ACT-77 · Cleaning of the exit of the augers.
ACT-78 · Revision of synchronization of lifting cylinders.To be performed at an authorised workshop
ACT-79 · Condition check of roller bearings.
ACT-80 · Grease cutter bar blades.
ACT-81 · Replacement of suction filter.To be performed at an authorised workshop
ACT-82 · Replacement of high pressure filter.
ACT-83 · Replacement of the return filter.To be performed at an authorised workshop
ACT-84 · General condition of the machine.
ACT-86 · Grease tripuntal.
ACT-87 · Grease cylinder ball joint.
ACT-88 · Verify the absence of cracks in welding and screws in the tie.
ACT-89 · Lubrication of the cutter bar cranks.
ACT-90 · Grease of the hitch joint.
ACT-91 · Revision of safety valves.
ACT-92 · Grease chrome extension tubes.
ACT-93 · Oil level check in gearboxes.
ACT-94 · Retightening of screws, nuts and fittings.
ACT-95 · Light cleaning (excess grease, dust or mud).
ACT-96 · Oil level of the multiplier group.
ACT-97 · Oil change in multiplier unit (SAE90).
ACT-98 · Grease major joints.
ACT-99 · Review of knives and counter-knives.
ACT-100 · Sharpening of the cutter bar blades.
ACT-101 · Review and adjustment of the perpendicularity of the head.
ACT-102 · Changing blades.
ACT-103 · Tightening of fittings and condition of hydraulic pipes.
ACT-104 · Review of inter-vine bearing clearances. (Replacement of grease
ACT-105 · Sensor regulation.
ACT-106 · Check the tension of the auger chains.
ACT-107 · Checking the condition of the wheels, cracks, crystallization,
ACT-108 · Check the condition of the door closing rubbers.
ACT-109 · Replacement of the Nylon/Bronze mast plates and telescopic guid
ACT-110 · Revision of ball joint wear and spring shaft.
ACT-111 · Replacement of hydraulic roller extension bearings.To be performed at an authorised workshop
ACT-112 · Checking the straps of the cutter bars.
ACT-113 · Replacement of the dispenser outlet filter.To be performed at an authorised workshop
ACT-114 · Grease bearings.
ACT-115 · Changing cable ties.
ACT-116 · Change of inter-strain pressure kit.To be performed at an authorised workshop
ACT-117 · Replace roller bearings.
ACT-118 · Checking oil leaks in interstrain cylinders.
ACT-119 · Invert drive or replacement axes (Probe axis in simple model).To be performed at an authorised workshop
ACT-120 · Changing the filters of the hydraulic power plant.
ACT-121 · Hydraulic pressure control and regulation.
ACT-122 · Grease grease of the cutting module.
ACT-123 · RPM inductive sensor wiring change.To be performed at an authorised workshop
ACT-124 · Replacement of the probe spring kit (spring + screw).
ACT-125 · Replacement of the oil filter in pressure (ERI).To be performed at an authorised workshop
ACT-126 · Complete overhaul and tuning of the machine by specialized techTo be performed at an authorised workshop